Pond cost comes down to how much dirt moves and how far, the soil, the dam, and access. A small stock pond in good clay on open pasture is a straightforward job. A big, deep pond with a tall dam, a spillway and clay hauled in for a liner is a much bigger one. Redden Excavation walks the site and gives you a straight number.
Size and depth
The amount of dirt moved is the biggest driver. Depth matters for water that lasts through an Oklahoma August, and deeper ponds lose a smaller share to evaporation.
The soil
Clay that holds water keeps cost down. Sandy or rocky ground may need clay brought in and packed as a liner, which adds a lot.
The dam
Dams need the topsoil and roots stripped out from under them and a clay core packed in layers. Taller dams take more time and care.
Spillway and overflow
A spillway shaped so storms go around the dam is part of a pond that lasts.
Access and clearing
Trees and brush on the site, soft ground and a long way in for the machines all add time. See land clearing.
Help with farm ponds
On farm ground, your county conservation district and the NRCS can sometimes help with design, and programs like EQIP have helped with livestock water in some cases. It is worth a call before you build.
Common Questions
How big should my pond be?
That depends on what it is for, how much land drains into it and how many head drink from it.
Will it hold water?
In good clay, packed right, usually. We look at the soil as we dig.
When is the best time to build a pond?
When the ground is dry enough to work and pack well, often late summer and fall.
Getting a Real Number for Your Job
Thinking about a pond? See pond digging or call (918) 320-3439.

