Building Pads

Building Pads, Start to Finish

The pad is the part of a building nobody sees and everybody pays for if it is wrong. Organic topsoil left under a slab rots and settles. Fill dumped in one deep pile settles unevenly. Red clay packed too wet or too dry moves. Cracked slabs and doors that stick are often pad problems.

Redden Excavation builds pads properly. We strip the topsoil, cut the high side and fill the low side, place fill in thin lifts and pack each one, and set the top to the grade and size your builder or slab crew calls for. On a sloped lot that often means a cut on one side and a built-up side on the other.

Metal shops are a big one around Tulsa. A shop pad is usually bigger than the building so there is room for the forms and an apron, and it needs to sit high enough that water runs away from it.

Compact track loader spreading red Oklahoma dirt on a building pad
What you get

What Goes Into a Pad

  • Clearing and topsoil stripping
  • Cut and fill to bring the site to grade
  • Fill placed in lifts and packed
  • Pad sized beyond the building for forms and aprons
  • Top set to grade, with fall away from the pad
  • Rock or select fill brought in when needed

Metal shops and barns

Pads for metal buildings and pole barns are the most common pad job on acreage around Tulsa.

House pads

For new homes we work to the builder's plan, often alongside the footings and utility trenches.

Sloped lots

Hillside lots need a cut and fill, and sometimes a retaining wall or a swale behind the pad to keep water off it.

Red clay

Oklahoma red clay can shrink and swell with moisture. A pad built at the right moisture and packed well handles it better. On some sites an engineer may call for select fill.

What comes next

Once the pad is set, the concrete crew forms and pours. We can come back for the drive and final grade. See gravel driveways.

On the job

Building Pads, Up Close

Real photos from Redden Excavation jobs. See more recent work.

Track loader working a red dirt pad, seen from the bed of the truck
Red Dirt Pad
Compact track loader spreading red Oklahoma dirt on a building pad
Pad Work
Freshly graded dirt beside a brick house, seen from the machine
Final Grade by the House
Questions

Building Pads Questions

Not seeing yours? Call (918) 320-3439 and ask Kasen.

How much bigger than the building should the pad be?

Usually a few feet on every side for forms and drainage. Your slab crew will say.

Do I need fill brought in?

On flat low lots, often. On sloped lots, the cut side can sometimes fill the low side.

Can you build a pad in winter?

If the ground is not frozen or saturated.

Do you pour the slab?

No. We build the pad.

How it works

How a Job Runs

Call or Send the Job

Tell us where it is and what needs digging. A photo of the spot helps. Emergency? Call, day or night.

811 and a Look

Public lines get marked through Okie811 first. We check the ground, the access for the machines and any private lines.

A Straight Price

You get an estimate and a plain answer on how we would do it. Estimates on planned work are free.

We Dig

The right machine for the spot: the mini excavator in tight yards, the big excavator for deep or long digs.

Backfilled and Clean

Backfilled, packed and graded back. We leave the yard ready to mow, not a mud pit.