Digging In an In-Ground Storm Shelter in Oklahoma

By Redden Excavation Co.. Updated November 24, 2026.

An in-ground shelter needs a hole sized to the unit with room to set it, a firm level bottom, good backfill, and grading that sends rain away from the door. Most of what goes wrong on dig day comes down to access, buried lines, rock and water, and all four can be planned for ahead.

Pick the shelter first

The shelter company decides the hole size, the depth and how the unit is anchored. Ask whether the shelter is tested to recognized standards for tornado shelters. The dig follows their spec.

Access

A yard shelter has to get into the yard. Some are set with a crane or a boom truck from the street, others with the excavator. Fences, gates, overhead lines and buried lines all matter. Look at the path before the shelter is delivered.

Buried lines

Shelters often go in back yards that carry gas, power, water, cable and sprinkler lines. Okie811 marks the public ones. Private lines, like power to a shed, do not get marked. Know where they are.

Rock and clay

Most of the Tulsa area digs in clay, but some lots hit sandstone shallow. Clay holds a clean wall, but a hole in clay can also hold water like a bowl after a rain.

Backfill and water

Once the shelter is set and anchored, backfill goes in around it and is packed. The ground around the entry gets graded so surface water runs away from the door. Water is the most common complaint with in-ground shelters, and grading is the first defense.

Garage floor shelters

Garage shelters mean cutting the slab to size, breaking it out, digging the hole and hauling the concrete and dirt away. The shelter company sets the unit and finishes the floor.

Register it

The City of Tulsa and many other cities keep a storm shelter registry so first responders know where to check after a tornado. Oklahoma has also run safe room rebate programs in some years. Both are worth checking once your shelter is in.

Common Questions

How long does a shelter dig take?

Most yard shelter holes are dug in a day or less. Garage shelters take longer because of the concrete.

Do I need a permit for a storm shelter?

Some cities require one. Check with your city or ask your shelter company.

What happens to the extra dirt?

A shelter displaces a lot of dirt. It can be spread to fill low spots or hauled away.

What to Do Next

Bought a shelter and need it dug in? Call (918) 320-3439. See storm shelter digs.

See our storm shelter digs service or call (918) 320-3439.